“The first 90% of a project takes 90% of the time, the last 10% takes the other 90% of the time”
Zeitrechnung
Posted
in
by
Tags:
“The first 90% of a project takes 90% of the time, the last 10% takes the other 90% of the time”
Posted
in
by
Tags: